Program 1

4G & Evolution

Program 2

5G eMBB

Program 3

5G ENS

Program 4

Innovative Business&Service

Program 5

Cloud Robot

Coordinators

Nan Li     China Mobile

Carlson Chu     PCCW

Kathleen Leach     Sprint

Zhouyu Deng     Huawei

Qi Guo     ZTE

Objective

Facing the rapid development of data requirements on new service & applications, efficient utilization of LTE is in need to enhance performance and service capability.

Work scope

Massive-MIMO, Uplink Enhancement, VoLTE (closed), Smooth Evolution, Roaming, Innovative Business & Service, Small Cell (closed), eMBMS (closed), LTE Plus

Work plan

2019
2020
2017
2018
  • Continue to improve 4G network capacity and capability
  • Promote 4G/5G collaborative evolution
  • Massive-MIMO eNB White Paper
  • UDC,MEC and Small cell requirements and plan
  • Whitepaper update:UL CA, DL CA and HPUEDL 4*4MIMO
  • VoLTE commercial rollout and Whitepaper update
  • Smooth Evolution from 4G to 5G White Paper
  • Massive-MIMO eNB enhancement
  • Field trial:UL CA, DL CA and DL 4*4MIMO
  • eVoLTE Field trial
  • Massive-MIMO eNB further enhancement.

Leader

Zhengwei Jiang    ZTE
Hui Huang    Huawei

Objective

1. To promote the development of Massive MIMO product
2. To facilitate the commercialization of Massive MIMO
3. To study the evolution of Massive MIMO towards 5G

Work Scope

1. Discuss and verify the technical issues of Massive MIMO product, including product enhancements and 5G evolution. Output and update technical reports regularly
2. Analyze the benefits and experience of deploying Massive MIMO in commercial networks. Share the findings with GTI members.
3. Discuss and output the technical requirements from an industry perspective. Organize meetings and task works to faciliate Massive MIMO related devices, chipsets and test instruments.

Leader

Bo Xie    Huawei
Shuping Chen    Qualcomm

Detailed information is coming soon.

The project has been completed and closed.

Leader

Yogendra Shukla    Nokia

Objective

Facing the rapid development of data requirements on new service & applications, efficient utilization of LTE is in need to enhance performance and service capability

Work Scope

Task-S-PM1-PJ4-1: TDD Spectrum Promotion and Refarming Issues (closed)
Task-N-PM1-PJ4-2: Forward Compatible Hardware (Smooth Evolution to 5G) (closed)
Task-N-PM1-PJ4-3: Core Network Evolution (closed)
Task-B-PM1-PJ4-4: Hardware Reuse to Protect Investment (closed)
Task-S-PM1-PJ4-5: Spectrum and Coexistence
Task-N-PM1-PJ4-6: 5.eLTE+5GC
Task-N-PM1-PJ4-7: 4G/5G Spectrum Sharing

Leader

Kathleen Leach    Sprint

Objective

1. Provide education to GTI operators
2. Promote expansion of TD-LTE roaming. Support development of VoLTE roaming
3. Expand cross GTI Work Group Collaboration
4. Collaborate on E2E VoLTE workplan with business scenarios, models and market & industry impacts.

Work Scope

Cover TD-LTE and VoLTE Roaming activities and Whitepapers

Leader

Kathleen Leach    Sprint
PS Tang    Arete M
Bai Wei    Baicells

Objective

1. To assist TDD Operators to secure funding to deploy TD-LTE Networks
2. To encourage and develop new Business Models to enable TDD Operators to address Vertical Industries
3. To encourage Vendors and Solution Partners to provide new Funding Schemes including Revenue Sharing Schemes
4. Track MEC progress and activity including MEC Base station. Highlight key MEC use cases applicable for TDD operators.
5. Develop Wireless Broadband Whitepaper
6. To encourage TDD spectrum holding company to deploy TD-LTE network with convincing business model

Work Scope

1. Information sharing on new and innovative vertical business models
2. Interact with various VC groups interested in investing in TDD operators or spectrum
3. Develop Wireless BB Whitepaper
4. Track and share MEC Industry Progress (from Network and business perspective)
5. Interact with various regional regulatory / org. to promote the TD-LTE usage.

The project has been completed and closed.

The project has been completed and closed.

Leader

Call for contributors. If you are interested, please contact GTI Secretariat [admin@gtigroup.org].

Coordinators

TBD     Vodafone

Nan Li     China Mobile

Junjiang Peng     Ericsson

Quanzhong Gao     Huawei

Objective

- Define 5G eMBB requirements/use case
- Validate system solution for eMBB through Lab tests & trials
- Define product requirement for support of key eMBB requirements
- Promote commercial deployment among GTI partners and with wider industry partners

Work scope

- Validate/Identify 5G eMBB deployment scenarios & use case with business models (e.g. traffic forecast, terminal penetration forecast, ARPU uplift etc.) partnering with industry vertical partners
- Validate technology solutions & system concepts for sub-6GHz and above 6GHz (mmWave) through end to end test environment Lab trials & field trials
- Develop recommendations on product architecture & hardware parameters based on Lab & field trials
- Promote large scale trials to enable commercial deployment of eMBB

Work plan

2019
2020
2017
2018
  • Accelerate Sub-6GHz industry maturity: release NSA recommendation whitepaper, learn key lessons from NSA/SA deployments and further focus on SA key issues such as IODT, MEC, network slicing, 4G/5G interworking, VONR, etc.
  • Promote 5G global device maturity: research on 5G device technology evolution and performance enhancement, GTI Certification of 5G chipset and device, exploration on S-Module application and 5G-enabled industry device
  • Strengthen intelligent network research: specify the benchmark test and evaluation approach for classification of network intelligence level, sort out high priority intelligent network use cases and study the solutions from NE and MS aspect
  • Kick off mm-wave study: research on mm-wave products and test solutions
  • - Define 5G eMBB requirements/Use cases and start developing models to identify business opportunities
  • - Define products architecture and share results from PoC/prototypes for sub-6GHz
  • - Validate performance for above 6GHz
  • - Mature business case & modelling to enable prioritisation of use cases
  • - Enable end to end test for sub-6GHz in an multi-vendor environment
  • - Develop hardware PoC & product architecture for above 6GHz
  • - Share learnings from pre-commercial large scale trials for sub-6GHz

Leader

I-Kang Fu    MTK
Yan Li    Qualcomm
Chen dageng    Huawei

Objective

Develop GTI's vision and recommendations to drive global 5G sub-6GHz commercialization

Work Scope

Vision on business use case, recommendations to global spectrum allocation, network /device requirements and test spec. to support global 5G deployment at sub-6GHz.

Leader

Call for contributors. If you are interested, please contact GTI Secretariat [admin@gtigroup.org].

Leader

Tetsu Sugaya    SoftBank
Ma Shuai    CMCC

Detailed information is coming soon.

Leader

Zhang Wenjuan    ZTE

Objective

1. Identify the requirement needs for eMBB architecture to enable the 5G defined scenarios
2. Provide architecture recommendations (both sub and above 6GHz) and support the architecture evolution
3. Leverage the architecture advantage introduced through network slicing (focus on sub 6GHz) and facilitate experiences sharing within/across industries

Work Scope

1. Identify 5G eMBB use cases/Requirements based on defined scenarios
2. Develop recommendations on product architecture
3. Perform network slicing study
4. Promote knowledge sharing within/across industries

Leader

Wang Wei    R&S
Feng Xiang    Keysight
Li Jia    Keysight
Yu Yuangjiang    Spirent
Wang Yong    VIAVI
Li Fei     EXFO

Objective

1. Define Basestaion & Device Test Requirment/Case.
2. Draft Basestation & Device Test Spec.
3. Coordinated development plan
4. Coordinated System Integration & Test Plan

Work Scope

1. BaseStation Test equipment include sub 6G, mm-wave RF & Performance Test
2. Device Test Platform include Conformance test & Performance & OTA Test

Leader

Cao Xi    CMCC

Detailed information is coming soon.

Coordinators

Herkole Sava     Sprint

Hu Yang     Nokia

Kathleen Leach     Sprint

Shanpeng Xiao     China Mobile

Raymond Qiao     Ericsson

Du Yeqing     Huawei

Xiaowu Zhao     ZTE Corporation

Objective

To promote operator-provided Enterprise Network Solutions based licensed spectrum to satisfy verticals’ requirements

Work scope

–Horizontal: Technical Realms
•Industry Requirements Introduction
•Spectrum Strategy for Verticals
•Products for Private Network
•Technical Architecture and Solutions
•Operating and Management
–Vertical Solutions

Work plan

2019
2020
2018
2019
2020
2018
2019
2020
2018
  • Promote operator-provided ENS by synergy between GTI and other relevant ICT and OT organizations
  • Explore advantages and key technical capabilities of ENS to fit in industrial value chain
  • 5G S-Module and device solutions in Greenfield and Brownfield verticals
  • Investigate solutions for operators to cope with the global trend of allocating local licensed spectrum for verticals
  • Research on security of 5G vertical industry service and device
  • C-IOT technology evolvement and global roaming
  • Operator-provided Enterprise Network Solutions Whitepapers
  • Promote operator-provided ENS by synergy between GTI and other relevant ICT and OT organizations
  • Explore advantages and key technical capabilities of ENS to fit in industrial value chain
  • 5G S-Module and device solutions in Greenfield and Brownfield verticals
  • Investigate solutions for operators to cope with the global trend of allocating local licensed spectrum for verticals
  • Research on security of 5G vertical industry service and device
  • C-IOT technology evolvement and global roaming
  • Operator-provided Enterprise Network Solutions Whitepapers
  • Promote operator-provided ENS by synergy between GTI and other relevant ICT and OT organizations
  • Explore advantages and key technical capabilities of ENS to fit in industrial value chain
  • 5G S-Module and device solutions in Greenfield and Brownfield verticals
  • Investigate solutions for operators to cope with the global trend of allocating local licensed spectrum for verticals
  • Research on security of 5G vertical industry service and device
  • C-IOT technology evolvement and global roaming
  • Operator-provided Enterprise Network Solutions Whitepapers

Leader

Kathleen Leach    Sprint
Raymond Qiao    Ericsson

Detailed information is coming soon.

Leader

Zhang Min    CMCC
Victoria Wang    Ericsson
Zhou Dong    ZTE

Detailed information is coming soon.

Leader

Diao Zhifeng    Huawei
Wen Zhicheng    Nokia
Yang Ying    Ruijie

Detailed information is coming soon.

Leader

Wang Zhong    Ericsson
Satish Jamadagni    RIL
Wang Yaobing    Huawei

Detailed information is coming soon.

Leader

Satish Jamadagni    RIL
Peng Yu    CICT

Detailed information is coming soon.

Leader

Fan Qiguang    CMCC
Yan Xincheng    ZTE

Detailed information is coming soon.

Leader

Call for contributors. If you are interested, please contact GTI Secretariat [admin@gtigroup.org].

Detailed information is coming soon.

Coordinators

Tetsu Sugaya     SoftBank

Sen Wang     CloudMinds

Xi Chen     Huawei

Objective

Promote the development of Cloud Robotics, by defining the Cloud Robot as a combined product of network, platform, and hardware.

Work scope

Build a cross-industry ecosystem, research and demonstration, Marketing

Work plan

2019
2020
2017
2018
  • Enabling the development of Cloud Robot and jointly exploring the market
  • Start hearing and discussion with technical partners, set up prototype environment
  • Whitepaper, prototype (LTE or WiFi) demonstration
  • Discuss 5G integration, revise Whitepaper

Leader

Detailed information is coming soon.

Objective

Identify and share key concepts, technologies and future of Cloud robotics, in the era of 5G mobile communication systems

Work Scope

Cover following topics in chapters
Market trends of communication robots and smart devices
Technologies behind cloud robots
Voice recognition, image recognition, and sensors
AI and machine learning & Cloud
Cloud Robotic Network Architecture (Network WG feedback prefarable)
5G mobile communication system and cloud robot (Network WG feedback prefarable)
Robot as a mobile network terminal (Terminal WG feedback preferable)
Applications for cloud robots
Business models of cloud robots for network operators

Leader

Detailed information is coming soon.

Objective

Demonstrate prototype Cloud Robot device, within test network environment

Work Scope

Select/Build prototype device
Setup prototype network environment (4G/4.5G , more focus on building the Cloud platform part)
Test network low latency(<30ms) by leveraging Mobile Edge Computing technology

Leader

Detailed information is coming soon.

Objective

Enhance the prototype environment by integrating 5G features.

Work Scope

This project needs consideration on 5G spectrum allocation (Spectrum WG feedback preferable)
Network architecture enhancement with 5G, possible introduction of edge computing (Network WG feedback prefarable)
Robot controller with 5G capability (Terminal WG feedback preferable)
Coordinate partner robot makers and Operators

Detailed information is coming soon.

Leader

Detailed information is coming soon.

Objective

Carry out Cloud Robot demonstration in Pre-commercial 5G environment

Work Scope

Build Pre-5G demonstration network
Prepare 5G capable demonstration robots
Promote, possible partnership with robot makers

Meeting name
  • ALL
  • 26th GTI Workshop
  • 25th GTI Workshop
  • 24th GTI Workshop
  • 23rd GTI Workshop
  • 22nd GTI Workshop
  • 21st GTI Workshop
  • 20th GTI Workshop
  • 19th GTI Workshop
  • 18th GTI Workshop
  • 17th GTI Workshop
  • 16th GTI Workshop
  • 15th GTI Workshop
  • 14th GTI Workshop
  • 13th GTI Workshop
  • 12th GTI Workshop
  • 11th GTI Workshop
  • 10th GTI Workshop
  • 9th GTI Workshop
  • 8th GTI Workshop
  • 7th GTI Workshop
  • 6th GTI Workshop
  • 5th GTI Workshop
  • 4th GTI Workshop
  • 3rd GTI Workshop
  • 2nd GTI Workshop
  • 1st GTI Workshop
  • Other
Working Group
  • ALL
  • Network
  • Terminal
  • Business&Service
  • 3.5GHz Interest Group
  • Spectrum Group
  • Summary
  • Plenary
  • 4G & Evolution
  • M-IoT
  • 5G eMBB
  • Innovative Business and Application
  • 5G ENS
  • Other
Task Force
Type
  • ALL
  • Official Doc
  • Working Doc
  • Other
Sub Type
  • ALL
Uploaded( et ) Meeting Name Doc Type Group Task Force Title Author
( Affiliation )
Actions

25th / Jun / 2019
20 :26 :13

25th GTI Workshop

Working Doc

5G eMBB

other

GTI-25TH-WS-5G-MN-04-GTI Workshop - MEC deployment solution and use case-20190610 V1.22

ZTE

Download

25th / Jun / 2019
20 :23 :59

25th GTI Workshop

Working Doc

5G eMBB

other

GTI-25TH-WS-5G-MN-03-5G Field Trial Progress

CMCC

Download

25th / Jun / 2019
20 :22 :08

25th GTI Workshop

Working Doc

5G eMBB

other

GTI-25TH-WS-5G-MN-02-Multiple Operator 5G Network Sychronization WP Release_final

Ericsson

Download

25th / Jun / 2019
20 :21 :19

25th GTI Workshop

Working Doc

5G eMBB

other

GTI-25TH-WS-5G-MN-01-GTI-25th-WS-5G Pre-Commercial Trial-0623-Final

Huawei

Download

24th / Jun / 2019
23 :58 :26

25th GTI Workshop

Working Doc

5G ENS

other

GTI-25TH-WS-5GENS-14-[NB04]2019_0624_GTI_MTK_NB

MTK

Download

24th / Jun / 2019
23 :56 :51

25th GTI Workshop

Working Doc

5G ENS

other

GTI-25TH-WS-5GENS-13-[NB03]NB-IoT Multi-carrier For Service And Capacity Enhancement_ZTE

ZTE

Download

24th / Jun / 2019
23 :55 :13

25th GTI Workshop

Working Doc

5G ENS

other

GTI-25TH-WS-5GENS-12-[NB02]Study the replacement of 2G usecases by NB-IoT and eMTC_Huawei-(To be upd

Huawei

Download
1 ... 18 19 20 21 22 23 24 25 26 27 
Back top

Please enter the keywords

ok
X Under Construction
I want to workI want to joinX