Task-N-PM2-PJ5-1: Base station test equipment

Leader

Huaizhi Yang Keysight
Yang Lan Keysight
Wang Jian R&S
Duan Xiao R&S

2017

Objective

1. RF spec test sub 6GHz
1.1. - Requirement definition
1.2. - Draft specification.
1.3. - Test equipment availabe
1.4. - Intial test started

2. RF spec test mmW

3. Performance test

Work plan

Q1

for Objective 1:
1.1. Test requirements:
- RF test, meeting & report
1.2. Test case spec:
1.3. Test equipment:
- Preparation

for Objective 3:
3.1. Phase1 test requirements

Q2

for Objective 1:
1.1. Test requirements:
- RF test, meeting & reprot
1.2. Test case spec:
- RF test, step 1/2
1.3. Test equipment:
- RF test, step 1

for Objective 3:
3.2. Test case specs

Q3

for Objective 1:
1.1. Test case spec:
- RF test, step 3
1.2. Test equipment:
- RF test, step 2/3

for Objective 3:
3.2. Test case specs

Q4

for Objective 1:
1.1. Test equipment:
System integretation and test

for Objective 2:
2.1. Start to discuss mm-wave test requirement according to the 5G frequency band definition

for Objective 3:
3.3. Test eqipment developing

2018

Objective

- Test platform ready
- Trial test with BS vendors
- Trial test with BS Vendors

Work plan

Q1

Test requirements:
- to get draft key RF spec for initial design of test method;
- to get the collaboration partner list inside this task, operator/BTS vendor company/test device vendor company…
- to get more input related with RF spec from project 1&2
Test case spec:
- An incomplete document designed to guide discussion and generate feedback, and may include several alternative solutions for consideration.
- A document in Spec format. Drafts are susceptible to substantial change during the review process.
Test equipment:
- test equipment design to meet the test spec.
Test equipment:
- Real test with Basestation vendors

Q2

Test equipment:
- Real test with Basestation vendors
Test case spec:
- A generally public documentis available for testing.
Test equipment:
- test equipment software implementation
- test equipment hardware implementation
Test equipment:
- Real test with Basestation vendors

Q3

Provide 5G Test Solution Map
Test equipment:
- Plan and scope for system integration, and define test phases
- Test spec for each integration test phase
- Prototype ready & Trial test
Test equipment:
- Real test with Basestation vendors

Q4

Test equipment:
- Real test with Basestation vendors
Test equipment:
- Real test with Basestation vendors
Test equipment:
- Real test with Basestation vendors